Customer Endorsements

Case Study 1 – Single Aisle Fleet Replacement

The Client   What our clients say...
A short haul Asia / Pacific airline.   "This was a complex project at a critical time post the 9/11 era when airline cash flows were down, but purchasing conditions were good. The positive outcome from this programme laid the ground work for long term profitability on short haul routes and assisted in the airline's financial recovery".

Mike Flanagan
Former GM Operations & Technical
The Challenge  
To replace aging wide bodied and single aisle aircraft that operate on short haul sectors with a more network appropriate, customer-worthy, cost effective fleet of aircraft.  
The Programme  
A single aisle fleet replacement project entailing RFP, evaluation, negotiation and contract.  
The Outcome  
B767s and B737-300s were replaced with an A320 fleet purchased at a price that gave both superior Cash Operating Costs and Direct Operating Costs.  

 

Case Study 2 – Turboprop Fleet Replacement

The Client   What our clients say...
Air Nelson
Regional Turboprop airline
  "Mike led the project team of 4 during the acquisition project. The commercial success of this fleet purchasing programme enabled Air Nelson to achieve a 1:1 Fleet replacement of its 17 Saab fleet over 2 years (a 60% growth in seats capacity) with a further 6 units then added over the following 4 years. The success of this programme was achieved through reducing the DOC per available seat kilometer, in line with projections, whilst optimising the fixed costs through the purchase deal achieved and efficiency of the financing package. This created exponential profit growth for the airline and was an outstandingly successful project in every facet".

John Hambleton
CEO Air Nelson (2000 to 2009)
The Challenge  
Replacing the obsolete fleet of 33 seat Saab 340s with a 50 seat alternative to allow for capacity growth to meet market demand.  
The Programme  
A turboprop fleet replacement project entailing RFP, evaluation, negotiation and contract.  
The Outcome  
Q300 fleet purchase resulting in traffic and network growth with superior Cash Operating Costs and Direct Operating Costs.  

 

Case Study 3 – Long Haul Fleet Replacement

The Client   What our clients say...
Long haul international airline.   "This twin aisle aircraft replacement campaign looked out 25 years, and committed to a fleet of new generation aircraft. The program had an extremely successful commercial outcome. The improved fuel burn of the new long haul fleets gave the airline a competitive advantage in significantly reduced operating cost while the positive commercial outcomes will ensure the airline's competitive position for the foreseeable future".

Mike Flanagan
Former GM Operations & Technical
The Challenge  
Replacing aging wide bodied B747-400 and B767-300 aircraft on long haul routes.  
The Programme  
A complex wide-bodied fleet replacement project entailing fleet rollover planning, RFP, evaluation, negotiation and contract.  
The Outcome  
B777-300 / B787 fleet purchase with an interim solution of B777-200 Entry Into Service to cover the time to launch of the B787 fleet. Superior Cash Operating Costs and Direct Operating Costs resulting in an improved competitive advantage for the airline.  

 

Case Study 4 – Domestic Jet Fleet Replacement

The Client   What our clients say...
Domestic jet operator.   "The commercially positive outcome of this programme ensures the airline's cost competitiveness in its critical domestic market. It also ensures the longevity of this competitive advantage as Airbus improves the operating economics of the A320 over time".

The attention to detail across all facets of the project ensured that all the key business drivers were met, and indeed exceeded.
The Challenge  
Replacing aging single aisle B737-300 aircraft on short haul sectors.  
The Programme  
A single aisle fleet replacement project entailing RFP, evaluation, negotiation and contract.  
The Outcome  
A V2500 powered A320 fleet purchase with the rights to upgrade to "Sharklet" wing tip configuration and new engine combinations.  

 

Case Study 5 – Twin Aisle Fleet Operating Cost Study

The Client   What our clients say...
Domestic jet operator.   "Mike's insight into the comparative operating costs and operational issues with each fleet option enabled commercially sound decisions to be made in a relatively short time frame, that met the operational demands placed on the airline by its new management".
The Challenge  
Introducing wide-bodied aircraft onto domestic sectors.  
The Programme  
Analysis of A330 and B767 operating costs and review of the comparative benefits of each fleet.  
The Outcome  
A330 fleet introduced to service between major Australian cities.  

 

Case Study 6 – Turboprop Entry Into Service Project Management

The Client   What our clients say...
Skywest Airlines (Australia) Ltd
Domestic FIFO & RPT operator.
  "Mike is a solutions-oriented consultant with excellent project management and interpersonal skills. His wide industry experience and strong academic background together with his strong work ethic ensured that the project proceeded to plan and budget to accomplish the desired result".

Rod Mahoney
Chief Commercial Officer Avation PLC
The Challenge  
Set up a remotely based turboprop operation.  
The Programme  
Project manage Entry Into Service and negotiate airframe, components, engine maintenance agreements and line maintenance contracts.  
The Outcome  
Successful EIS and subsequent Airline buyout by the contracting airline.  

 

Case Study 7

The Client   What our clients say...
Luftfahrtgesellschaft Walter mbH – LGW is a European short haul turboprop operator, cooperation partner and capacity supplier to Air Berlin.   "The operations review by the New Zealand team gave our airline management team insights into the processes required to operate more effectively and provided practical solutions to the highlighted issues that could be implemented promptly and in a long term. The topics weren't new to the management team in all cases but through the operations review we received an external perception and good feedback on the internal procedures. The expertise and outstanding knowledge of the New Zealand team made this review a success".

Florian Rohe
Technical Director
LGW
The Challenge  
Poor on time performance of the Q400 fleet has been disrupting the network operations of Air Berlin.  
The Programme  
Operations review of the airline processes with subsequent recommendations.  
The Outcome  
The implementation of a basic system of management to migrate the operation to best practice.  

 

Case Study 8 – Turboprop Entry Into Service Project Management

The Client   What our clients say...
PNG Air
Domestic RPT and charter operator.
  "Mike has extensive experience in the aviation industry in particular aircraft evaluation, purchase negotiation and airline operations. Considering the airline's financial position this was not an easy job and Mike certainly brought credibility to the negotiating table. Introducing a new fleet is a specialised field and it would not have been possible for PNG Air without Mike's expert support. Mike's disciplined project management, great interpersonal skills and focused work ethic meant that despite significant commercial hurdles the new fleet was introduced into service in the shortest time possible. Mike can be relied on to deliver a commercially successful outcome".

Muralee Siva
CEO
PNG Air
The Challenge  
Replace an aging fleet of turboprop aircraft and improve the operational effectiveness of the airline.  
The Programme  
Project manage aircraft evaluation, purchase negotiations, aircraft financing through sale and lease back and Entry Into Service. In addition to negotiate airframe, components and engine maintenance contracts.  
The Outcome  
A purchase agreement with sale and lease back for a fleet of ATR72-600 turboprops and on time and on budget EIS.